Wisun Energy Saving Technology
CASE
COLLABORATION CASES
Cutting Fluid | Vietnam Precision Electronics Processing Plant
A precision electronics processing plant in Vietnam specializes in aluminum alloy and stainless steel structural components, supporting production lines for smartphone middle frames and laptop casings.Pain Points: High tool wear during high-speed milling, cutting fluid prone to foul odors and degradation, yellow spotting on workpieces, and frequent fluid changes. Additionally, imported cutting fluids were expensive and had long lead times.
MORE+06
2026-06
Engine Oil | Russia (0W-20 Fully Synthetic)
The customer operates 32 service centers catering to Russian, European, and Japanese passenger vehicles. Pain Points: Severe cold-start wear in extreme cold (-35°C to -40°C), with conventional engine oils prone to gelling and causing high fuel consumption. Additionally, imported European engine oils were expensive, suffered from an unstable supply, and had a long lead time of 4–6 weeks.
06
2026-06
Grease | Germany (Bearing-Specific Grease)
Bearing Operating Conditions: Wide temperature range (-30°C to 120°C), heavy loads, low speed, and long service life requirements (5+ years).Pain Points: Imported greases are expensive, suffer from an unstable supply, and have a long lead time of 6–8 weeks.
06
2026-06
Equipment Oil | Canada (High-Temperature Heavy-Duty Equipment Oil)
Rolling mills, continuous casting machines, fans, and gearboxes operate continuously 24/7.Operating Conditions: High temperatures (120–150°C), heavy loads, high impact, and high risk of emulsification. Pain Points: Imported equipment oils are expensive, suffer from an unstable supply, and have a long lead time of 5–7 weeks.
06
2026-06
A mechanical processing plant in Malaysia specializes in high-hardness steel components, including engineering machinery gears, flanges, and shafts. Their operations involve 24/7 continuous heavy-duty cutting, deep-hole drilling, and gear hobbing.Challenges: High temperatures, heavy loads, extreme cutting heat, heavy oil mist, and frequent smoking. Previously, imported cutting oils were expensive and suffered from an unstable supply with a 5–7 week lead time. Additionally, the pungent oil smoke and poor workpiece surface finish were significant pain points.